Introduction
Organize unit access, incident records and repair handoffs when a leak affects a shared building.
Reports may reach the building office from several units before anyone knows whether they belong to the same incident. Use suite numbers and timestamps to map the observations without assigning a cause prematurely.
Assign a building coordinator
Identify who can make access decisions and update occupants. Give the crews a backup contact for after-hours questions.
Map the reported path
Use a floor plan to record where water first appeared and which suites reported changes. Record observations before drawing conclusions about the source.
Confirm unit entry
Determine how each tenant will be notified and who can authorize entry. Record alternate arrangements for unoccupied units.
- Assign a building coordinator
- Map the reported path
- Confirm unit entry
Coordinate the source assessment
Give the appropriate trade access to the fixtures and building systems under review. Keep its findings available to the restoration lead.
Track materials by unit
Label photos and assessment notes with the unit, room and date. Record any shared walls or ceilings that require follow-up.
Discuss equipment placement
Review how equipment and work areas may affect corridors, lifts or occupied suites. Confirm which routes must remain open.
- Coordinate the source assessment
- Track materials by unit
- Discuss equipment placement
Plan repeat visits
Agree on monitoring times for each unit and share them with the building coordinator. Update the schedule when access changes.
Review open decisions
Keep a list of repairs, material approvals and access questions that still need action. Assign an owner to each item so work can move between teams.
Share updates by unit
Tell each tenant what is happening in their area and what access is needed next. Maintain a common schedule for crews and facilities staff.
- Plan repeat visits
- Review open decisions
- Share updates by unit
Close out each area
Record completed work and any follow-up separately for each suite. Keep a building-level summary for the property manager.
Track access attempts and approvals separately for each suite. If a unit is unavailable, the restoration lead can still see what was inspected, what remains open and whom to contact.
Conclusion
Track access, repair decisions and completion by unit while keeping a building-wide schedule. This gives each tenant an accurate update and helps facilities see what is still open.